Asphalt Paving & Resurfacing Contractor in Dubai

    Scope of works

    Asphalt works combine pavement preparation, material control and disciplined paving operations. Al Manader delivers asphalt packages for developers, consultants and main contractors in Dubai, including internal road networks, access roads, car parks and infrastructure interfaces. The scope can cover full-depth pavement construction or rehabilitation of an existing road, depending on the approved design and condition of the underlying layers.

    For new pavements, we coordinate subgrade preparation, aggregate subbase, road base and wet mix macadam before asphalt placement. Levels, falls and interfaces are checked so that the final wearing course connects correctly to kerbs, drainage structures and adjoining surfaces. Prime coats and tack coats provide the specified bond between prepared granular layers and successive asphalt courses.

    Resurfacing starts with a review of the existing pavement and the proposed milling depth. Cold planing removes the affected surface, while local repairs address areas that cannot be corrected by an overlay alone. Milling limits, tie-ins and access requirements are agreed with the project team before paving. This helps distinguish a surface rehabilitation package from work requiring deeper pavement reconstruction.

    Paving is planned around approved asphalt mixes, deliveries, available working width and compaction equipment. Binder and wearing courses are installed to the project specification, with temperature checks and inspection records supporting quality control. For operational developments and live access routes, we coordinate the working sequence and phased handover with the main contractor, including final markings and drainage interfaces where included in the scope.

    Al Manader has delivered road and civil infrastructure works since 2007. Our in-house crews and equipment support coordinated execution across pavement, drainage and finishing activities. ISO 9001, ISO 14001 and ISO 45001 certification underpins our approach to quality, environmental management and occupational health and safety. We work with the project team to define inspection points, document completed works and manage interfaces before handover. Share the issued drawings, scope and programme with our team to discuss the requirements of your Dubai project.

    Project photography

    AMRCE asphalt paver laying a night shift wearing course in DubaiAsphalt paving and rolling on a Dubai campus access roadFresh asphalt surfacing laid by AMRCE in Dubai
    Request a Quote

    Suppliers & subcontractors: register as a vendor

    Frequently asked questions

    Do you handle full-depth asphalt construction as well as resurfacing?

    Yes. We build new pavements from subgrade to wearing course and also mill and resurface existing roads, car parks and access roads.

    How long before a new asphalt road can open to traffic?

    Once the wearing course has been compacted and cooled, a road can usually reopen the same day; the exact timing depends on layer thickness, weather and the consultant's release.

    Do you own your paving equipment?

    Yes. Our crews work with company-owned pavers, rollers and support plant, which keeps programmes under our control.